    Walkthrough: Co-Products

    The following walkthrough is an example of how co-products are handled in Scheduler.

    Walkthrough

    Bulk green peppers are purchased to be used in 4-packs and as singles. The 4-packs are created first, and any leftovers are used for the single green peppers.

    The JFF-00040 item is the 4-pack of peppers, and the JFF-00042 item (Pepper-Green Singles) is the co-product.

    Walkthrough image CP1

    The JFF-00040 item uses the JFF-00040 routing. The JFF-00040 routing uses the work center BFL2HP.

    Note

    The co-product JFF-00042 item does not have a routing.

    Walkthrough image CP2

    A Scheduler view is set up for the work center BFL2HP.

    The location is set to DETROIT.

    Walkthrough image CP3

    A production order was created for the JFF-00040 item.

    Walkthrough image CP4

    On the production order, the Create/Update Co Products Prod. Orders action is chosen.

    This action creates a production order for the co-product JFF-00042 item.

    Note

    The co-product JFF-00042 item does not appear on the Scheduler because it does not have a routing.

    Walkthrough image CP7 Walkthrough image CP4a

    The Scheduler shows the production order starting at 7:00AM.

    Walkthrough image CP5

    The production order was dragged and dropped to 6:00AM.

    Walkthrough image CP6

    Because the original production order was moved in Scheduler, the Create/Update Co Products Prod. Orders action must be run again to update the co-product production order.

    The start time for the co-product production order was changed to 6:00AM.

    Walkthrough image CP7 Walkthrough image CP8