Work Ctr. Sched. by Lot Size Report
The Work Ctr. Sched. by Lot Size report displays a work center's schedule according to lot size. The report displays the start time and run time of each batch of a larger production run. The report must be run against a Work in Progress (WIP) item that has batches.
This report has an RDLC layout.